List of water supply and sewer facilities requiring investments for their construction

 

No. p / p

Object name

Availability of design and estimate documentation

Estimated cost, euro

Justification of construction

Объекты водоснабжения

1

Off-site networks and facilities in the city of Berezino, Minsk region

expert opinion dated February 22, 2011 No. 1730-15/10

 

3 200 000

The urban population is 11.9 thousand inhabitants. The main source of water supply is 11 single wells. The coverage of the population with centralized water supply is 11.7 thousand people. (98%). The average concentration of iron in the water supply system is 1 mg/l. In the summer period - long-term interruptions in water supply.

2

Construction of a water deironing station in Zaslavl

need to develop

1 500 000

Most of the city is supplied with water from the water intake "Khmelevka" (5 art wells), with a capacity of 3150 m³ / day. The population is 14.3 thousand people. The average concentration of iron in the water supply system is 1.0 mg/l.

Water disposal facilities

3

Reconstruction of the sewerage system in the city of Fanipol (including the construction of new sewage treatment facilities)

The design and estimate documentation has been developed and is being reviewed

5 000 000

The existing sewage treatment facilities have been operated without modernization for more than 45 years, the wear of structures and equipment is 90%.

4

Очистные сооружения канализации г. Любани

 

conclusion of the examination dated 06.05.2011 No. 292-15/11

9 990 000

Wastewater treatment plant in Lyuban

5

Sewerage of the city of Uzdy (including the construction of treatment facilities)

expert opinion dated September 27, 2012 No. 651-15/12

6 800 000

The equipment for biological wastewater treatment is not functioning, the wear of structures is 80%. The project provides for the reconstruction of sewer collectors, pumping stations and treatment facilities.

 

List of boiler facilities requiring investments for their reconstruction

 

No.
p/p
Business name Boiler room / facility Address Installed boiler equipment Type of fuel Installed capacity, Gcal/h Attached load, Gcal/h Year of construction Estimated cost, million rubles Implemented power, MW
General MW Gas liquid General Heating DHW Steam,
vent.
1 Municipal unitary enterprise "Kopyl housing and communal services" Boiler room No. 1 Kopyl, st. Thermal, 1 DKVR-6.5/13GM (2 pieces), DE-25-14GM (1 piece) gas 23,751   23,751   10,998 7,498 3,500   1977 6,5 8,0
2 Republican unitary enterprise "Lubansk housing and communal services" Central boiler house
Luban
Luban, per. Socialist, 1 DE-25-14GM (1 pc.), DE-25-10GM (1 pc.), DKVR-10/13 (1 pc.) gas 38,000   38,000   15,940 14,190 1,750   1977 7,0 10,0
3 UE "Myadelskoe housing and communal services" Boiler room
Myadel
Myadel, st. Industrial KVGM-20 (1 pc.), KVGM-10 (1 pc.), DKVR-10/13 (2 pcs.), E-1/9 (2 pcs.), Tendom QantoC1200 (1 pc.) gas 45,072   36,472 8,600 37,625 28,790 6,454 2,381 1971 10,0 16,0
4 UE "Zhilteploservis" KH Pukhovichsky district Boiler room No. 1 Maryina Gorka, st. Andreevskaya, 2 PTVM-30 (2 pcs.) gas 60,000   60,000   24,980 17,900 7,080   1986 9,0 15,0
5 Municipal unitary enterprise "Slutsk housing and communal services" Boiler room
#2
Slutsk, st. 14 Partizan, 100 DKVR-4/13 (2 pcs.), KVGM-30 (2 pcs.) gas 65,200   65,200   29,500 19,860 9,640   1986 10,0 16,0